Home
About us
Our System
Products and Services
Contact
 


We have the expertise and backup to ensure that any aspect of waste composting can be undertaken with quarantees of performance levels, be it for a complete turnkey project for 100,000+ tonnes per annum or a single temperature probe.

Design and Specification.  5000 to 100,000+ tonnes per annum, single, double ended, open bunkers (greenwaste), fully closed tunnels (ABPO). Filled with foreloader, in-tunnel filler or state of the art overhead filling. Just some of the criteria that needs evaluation to enable our system to fit your footprint and compost your particular feedstock to acheive PAS 100.

Planning. Our drawing office can undertake the whole planning application or just help with your Environmental licence ? I'm sure we can fit into your plans.

 Single ended 150 tonne fully enclosed Tunnel. Underfloor aeration. Computer controlled. Air washing                       

Construction.  Our preferred joint venture partners in turnkey projects is Ashridge construction but, we are quite happy to work with your preferred civil engneers. 

Overhead In-vessel filling system

HACCPs and Hazops. HACCPs to ensure product integrity and SVS approval and Hazops to evaluate any potential problems in operation.

Commissioning, Training and monitoring. With any project its' success and our reputation, depends on how it is operated after completion. to this end we will train your staff prior to and during commissioning and have a member of our team available for up to 6 weeks after start up after whch time we can monitor personally or via a modem.

 
Top